Elbe crossing near Hamburg: 1,400 m gas pipeline under the river
A 1,400 m gas pipeline under the Elbe needed 3,000 litres of fluid per minute at peak. One mixing unit, one recycler and two storage tanks kept the rig running for eleven days without a single fluid stop.

All projects

District heating in Utrecht: twelve short bores in a dense street grid
Compact site setup with lighting towers, a 10 ft container and rod handling for night work in the city centre

Custom-built 40 m3 storage tank for a trailer-mounted setup
Designed to the trailer, built in Nijverdal, tested before delivery

Overhaul of a 2019 mixing unit: back on site in nine working days
New venturi, pump seals and control panel for a unit with 4,800 running hours

Rod handling and lighting for a 24-hour motorway crossing
Two shifts, one RodGrip Pro and four lighting towers on a 620 m bore under the E20

Fluid recycling on a 900 m fibre bore through mixed ground
Stackable filter skids and a recycler kept the fluid clean through sand, clay and cobbles
Have a similar project?
Contact our team to discuss your drilling requirements and see how we can help with your next project.